• Facebook
Advanced Rehabilitation Technology
  • Home
  • Blog
  • About Us
  • Products
    • Manhole Rehabilitation
    • Stormwater Culverts
    • Potable Water Systems
    • Treatment Plant Lining
    • Lift & Pump Stations
  • Services
    • I & I Reduction
    • CCTV Inspection and Cleaning
    • Industrial & Manufacturing
    • Trenchless Boring
  • Contact Us
    • Join Our Team
Select Page

6 Causes and Treatments of Manhole Inflow and Infiltration Issues

by adretechadmin_ | Nov 18, 2022 | Uncategorized

Inflow and infiltration (I&I) is excess water that flows into sewer pipes from stormwater (inflow) and groundwater (infiltration).  In this blog post, we’ll break down the causes and best practices for treatment of I&I even further.  This illustration shows...

How a Small Investment Returned Huge Savings: City of Johnstown Project Highlight

by adretechadmin_ | Oct 19, 2022 | Uncategorized

​In 2021, the city of Johnstown, PA experienced severe infiltration at the casting and cone joint of a 3.17vf manhole located approximately 150’ down in a Gautier Steel Limited tunnel.  How severe?  At an estimated 40 gallons per minute or 2,400 gallons per hour, that...

A New Perspective on the Benefits of Manhole Rehabilitation

by adretechadmin_ | Aug 17, 2022 | Uncategorized

We recently read MSW Magazine’s article,  “The Costs of Uneven Manholes” and it struck a chord with us.  Although the article focuses on new technologies with installing new manholes and leveling existing ones, the main benefits of these methods also parallel the way...

Advanced Rehabilitation Technology Featured in I&I Magazine

by adretechadmin_ | Jun 29, 2022 | Uncategorized

What happens when a garbage truck falls into a sinkhole connected to a manhole?  The city of Parkersburg, West Virginia called us to look at the site and determine if trenchless technology could fix it with our fast-curing, manhole lining technologies.  This powerful...

Annual manhole rehabilitation aims to stop infiltration

by adretechadmin_ | May 17, 2022 | Uncategorized

Every year, Ross Township budgets approximately $125,000 for manhole rehabilitation. The township’s wastewater system, like many across the nation, is composed of many old brick manholes that are beginning to degrade and become inefficient. Manhole infiltration is the...

Manhole lining demonstration seals the deal in Altoona, Pennsylvania

by adretechadmin_ | Apr 28, 2022 | Uncategorized

Product demonstrations are one of the many ways ART can show our customers the power of OBIC’s customizable lining systems. We ask potential customers to provide a leaking manhole and our team comes out and demonstrates the rehabilitation process from start to...
« Older Entries
Next Entries »

Recent Posts

  • Interceptor Sewer Rehabilitation Without Replacement: ART’s Evergreen–Farmington Project
  • Industrial Secondary Containment Solutions: ART Restores Chemical Offloading Pads at St. Joseph Energy Center
  • From Prep to Perfection: ART’s Approach to a 7.5-Million-Gallon Tank Rehab
  • Strengthening Sales: Meet ART’s Client Support Team
  • Meet David E. Rogers, the New Safety Director at ART

Meeting & Training Room Rental

© 2020-2026 Advanced Rehabilitation Technology | 525 Winzeler Drive, Unit 1, Bryan, OH 43506 | Office 419-636-2684 | Fax 419-636-7437 | All Rights Reserved | Site Design by Natural Design & Graphics, LLC
Cleantalk Pixel

Terms and Conditions - Privacy Policy