by Danielle Scott | Aug 6, 2026 | Uncategorized
Pump stations are some of the hardest-working assets in any wastewater collection system. They move millions of gallons of wastewater every year, operating around the clock with little attention. That is, until something goes wrong. Unfortunately, many municipalities...
by Danielle Scott | Apr 20, 2026 | Uncategorized
Texas is one of the fastest-growing states in the country and its infrastructure is feeling the strain. From rapidly expanding cities to aging systems that haven’t kept pace, municipalities across the state are facing increasing pressure to maintain and rehabilitate...
by Danielle Scott | Apr 16, 2026 | Uncategorized
In a previous blog, we detailed how sewer systems are constantly exposed to corrosion, blockages, and structural deterioration but most of these issues develop out of sight. By the time problems like backups, sinkholes, or overflows occur, the damage is often already...
by Danielle Scott | Jan 30, 2026 | Uncategorized
Large-diameter interceptor sewers are the backbone of municipal wastewater systems, and when they begin to deteriorate, replacement is rarely a realistic or cost-effective option. That was the challenge facing the Oakland County Water Resources Commissioner’s Office...
by Danielle Scott | Dec 3, 2025 | Uncategorized
When the St. Joseph Energy Center in New Carlisle, Indiana (now operating as AEP Elderberry Station), a 700-megawatt natural gas-fired, 2×1 combined-cycle plant that provides clean, efficient energy for more than 400,000 households, needed a reliable solution for its...